1. 黄德先,叶心宇,竺建敏,李秀改. 化工过程先进控制. 化学工业出版社,2006

2. 黄德先,王京春,金以慧.过程控制系统. 清华大学出版社,2011,获北京市精品教材

学术论文:

1. Shang, C; Ji, HQ; Huang, XL; Yang, F; Huang, DX. Generalized grouped contributions for hierarchical fault diagnosis with group Lasso. CONTROL ENGINEERING PRACTICE,卷92,DEC 2019.

2. Wang, KC; Shang, C; Liu, L; Jiang, YH; Huang, DX; Yang, F .

Dynamic So Sensor Development Based on Convolutional Neural Networks. 58(26)-11521-11531. 2019

3. Shang, C; Yang, F; Huang, B; Huang, DX. Recursive Slow Feature Analysis for Adaptive Monitoring of Industrial Processes. IEEE TRANSACTIONS ON INDUSTRIAL ELECTRONICS. 65(11): 8895-8905. 2018

4. Gao, Xiaoyong; Wang, Yuhong; Feng, Zhenhui; Huang, DX. Plant Planning Optimization under Time-Varying Uncertainty: Case Study on a Poly(vinyl chloride) Plant. IDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH. 57(6):12182-12191. 2018

5. Gao, XY; Huang, DX; Jiang, YH; Chen, T. A decision tree based decomposition method for oil refinery scheduling. CHINESE JOURNAL OF CHEMICAL ENGINEERING. 26(SI): 1605-1612.2018

6. Su, JJ; Guo, C; Zang, H; Yang, F; Huang, DX; Gao, XY; Zhao, YA. A multi-setpoint delay-timer alarming strategy for industrial alarm monitoring. JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES. 54: 1-9. 2018

7. Gao, XY; Feng, ZH; Wang, YH; Huang, XL; Huang, DX; Chen, T; Lian, X. Piecewise Linear Approximation Based MILP Method for PVC Plant Planning Optimization. INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH. 57( 4): 1233-1244. 2018

8. F. Li, J. Zhang, C. Shang, D. Huang, E. Oko, and M. Wang. Modelling of a post-combustion CO2 capture process using deep belief network. Applied Thermal Engineering, 130, 997-1003. 2018


黄德先 可能工作过的组织/机构/部门/团队:


黄德先 可能工作过的同事:

粤ICP备17091748号-1
剧本杀复盘 剧本杀复盘 红酒 ChatGPT